Project Instructions

Read First

Review the staged plan and room priorities, then decide the number of resources required before confirming your plan.

  • Budget: £30,000, Time: 8 weeks (320h), Quality target: 80/100
  • Priorities: Kitchen first, Bathroom second, then Living areas, bedrooms, hallway, exterior
  • Decide manpower per room (roles and hours) using the Resources section
  • Materials quality affects cost and quality score; adjust in Materials
  • Workforce size, overtime, and skill affect cost/time/quality; adjust in Workforce
  • Confirm your resource plan in Week 1 to proceed; plan will lock after confirmation

House Floor Plan & Measurements

Project Layout

Reference the floor plan below to understand the house layout and plan your refurbishment tasks accordingly.

House Floor Plan
Planning Tips:
  • Kitchen and Bathroom are priority areas (marked in red)
  • Consider workflow and dependencies between rooms
  • Plan material delivery routes and access points
  • Account for electrical and plumbing connections
Room Measurements (SI Units)

Use these measurements to calculate material quantities needed for each room. All dimensions are in meters (m) and square meters (m²).

Room Length (m) Width (m) Height (m) Floor Area (m²) Wall Area (m²) Ceiling Area (m²) Notes
Important Notes:
  • Standard ceiling height: 2.7m throughout the house
  • Wall areas: Calculated with typical door and window openings deducted
  • Your task: Calculate material quantities needed based on these measurements, considering appropriate wastage factors
  • Remember: Different materials require different wastage percentages for cuts, mistakes, and future repairs
Week 1 of 6
£0
0h
0/100
Week 1 - Initial Planning

You're managing a house refurbishment with a £30,000 budget and 8-week deadline. The owner prioritizes Kitchen completion first, then Bathroom, with cosmetic tasks flexible.

Resource Planning

Confirm Your Resource Plan
You must confirm in Week 1 to proceed to events. Once locked, edits are disabled.
Room/Area Assigned Role Rate (£/hr) Estimated Hours Total Cost Actions
Room Instructions & Suggested Resources

Materials & Quality

Total Material Cost
£0
Quality Contribution
0 pts
Material Selection

Choose quality levels and quantities for each material. Higher quality costs more but improves project outcome.

Workforce Management & Capacity Planning

Workforce-Resource Alignment
Total Planned Hours
0h
From Resource Plan
Adjusted Duration
0h
After Team Efficiency
Weekly Hours Available
0h/wk
Team Capacity
Estimated Weeks
0 wks
Project Duration
Team Size

More workers = faster completion but higher costs

Efficiency: 70% time
Cost Multiplier: 1.8x
Overtime Policy
0 hrs 0 hrs/wk 20 hrs
Extra Hours/Week: +0h
Overtime Cost: £0
Skill Level

Higher skill = better quality but higher cost

Quality Impact: +0 pts
Cost Impact: 1.0x
Workforce Impact on Iron Triangle
Cost Impact
+£0
Labour cost adjustment
Time Impact
-0h
Time saved by team
Quality Impact
+0 pts
Skill contribution

Budget Analysis

Project Duration
0h
Labour Cost
£0
Materials Cost
£0
Total Cost
£0
Quality Score
0/100
Triangle Balance
0%

Project Status

Constraint Analysis
Trade-off Impact
Overall Status

Project Staging & Timeline

Project Staging Overview

The project follows a staged approach with dependencies between rooms and work packages.

Gantt Chart

Visual timeline showing project progress and room completion status.

Export Project Plan